Please enable JavaScript.
Coggle requires JavaScript to display documents.
Lean Manufacturing Waste - Coggle Diagram
Lean Manufacturing Waste
Producing above and beyond customer requirements, including unnecessary materials, products, info
-
-
Excess inventory requires additional manpower, equipment, floor space
-
More energy to heat, cool and light inventory space
-
Movement of materials is a waste, minimise amount of waste by arranging processes in close proximity to each other
Causes
-
-
-
-
-
More energy used for transport, more emissions, packaging, damage and spills
-
-
Examples
-
-
-
-
Wasted energy from heating, lighting, cooling
-
Unnecessary process steps, work elements or procedures (non-value added work)
-
Over inspection, checking, auditing, counting
-
-