Meg 35 Jackson St - Coggle Diagram
Meg 35 Jackson St
FF
Platform floor
Edge protection
Frame
Break in
Trusses
Hang on scaffold
Bracing
Inspection
Fascia & soffit
Preliminaries
Height survey
Survey pegs
ACM report
QBCC
QLeave
Contract
Schedule
Lead test
House raise
GF demolition
Sties
Raise
Excavation
Steel
Piers & footings
Temp bracing
Inspection
Footings - home & office
Profiles & set out
Surveyor
Excavations
Steel
Inspection
Pump & pour
Retaining walls
Substrate spread
Internals
Pre-wire
Rough ins
Linings
Fixout
Wet areas
Tiling
Joinery
Fit offs
Site set up
Site fence
Sediment control
Signage
Portaloo
Site shed
Water
Skips
Demolition
Electrical discon
Plumbing & gas discon
ACM removal
Scaffold
FF demolition
Tarps
GF sub-floor
Bearers and joist
Termite prot.
Elevated drainage
Stormwater
Platform floor
Water & gas
Lock up
Windows & doors
Cladding
Hoods
Decks & stairs internal & external
Downpipes
Scaffold
Roof
Gutter
Insulate
Re-roof
Temp downpipe
Carport
Slab
Frame
Roof
Garden storage
Turf & paving
Substrate prep
Gardens
Paving
Turf
Painter
External painting
Scaffold removal
Finishing
Floors
Painting
GF frame
Frame & brace
FF sub-floor
Bearers & joist
Site works
Block cut
Spa