35 Ibis St
Rear wall GF
Prop ceiling load
Remove windows and wall
Cut down upstand
Structural steel & framing
Stacker door measure
Secure opening
Stacker door install
External cladding, flashings & trim
Deck
Remove decking
Nog sub-floor
Install Scyon flooring
Drip edge & trim
Waterproofing
Tiling
Balustrade measure
Balustrade install
End wall
Floor framing
Frame wall
Electrical pre-wire
Scaffold
External cladding & flashing
Internal cladding
Window install
Store rooms
Remove ceiling sheeting
Electrical disconnection
Prop floor load
E
Remove block walls
Structural steel
Temporary kitchen backs
Preliminaries
Contract
QBCC Insurance
WH&S
Engineer consult
Gantt chart & scheduling
Demolition
Stair removal
Deck & balustrade removal
Temporary handrail
Stage 1 works