Installation of Ground Mounted Substation
Gantt Chart
Construction of Moving MV Line
Construction - Install Ground Mounted Sub
Change Protection Settings and Calculate Short Circuit Current
Comissioning of new works
Design Ground Mounted Sub
Old Network Feeding
Design OH Network
Chapters
Design
UG MV Design
Position of Ground Mounted Sun
Tail feed or Interconnected
Existing MV line
LV OH Redesign
New LV to feed temperary
Remove old LV
OH MV Redesign
Move to off site
Retire old MV
Incorporate future work (HOUSING ESTATE)
LV Design
Cables Used
Service
Mains
Ducting
Specifications
Ducting used
New Assets
Cable runs
Number of Circuits
MP installation
Electrical
UG to dwelling
UG Cables from Sub
Houses per circuit
Size of MV UG cable to match OH lines
Interconnection with other circuits
Size of Transformer
Domestic Dwelling
Electrical Certification Required
Finished work
Qualified Electrican
Fee Paid
Metering Required
Double PVC Cables
Documentation
Fuse unit, meter, isolator
Customers ground works
Taping
Ducting - roped
To drawing
Protection
MV Protection Settings
LV Fuses
Short Circuit Current
Fault Indicators
Commissioning
MV Cables
LV Cables
Sub
Voltage
Pre-Commissioning
LV Cables
MV Cables
Continuity
Insulation resistance
Phasing at substation
Ground mounted sub on Site
Introduction
Contractors - Process of applying
MV line moved
Location of Assets
Apply for house supplies
Personal involved
CS
CSS
EO
Off Site Contractor - Mullane
Contractor
Protection Specalist
Why job is being done
MV line through site
LV network requiring upgrade
82 new houses
Work Completeled
LV Cable Termination
MP
Sub
Meter Installation
MV Cable Termination
Sub
Pole Top
Sub Installation
Cable Pulling
Metering
Commissioning at Dwelling
End
Bibliography
Appendix
Conclusion
Network
Future
MV for SUB
Two premises off new LV
Fault indicator on cable
Ducting at depths
MV/LV Earths required for sub
Existing
LV Transformer - EARTH
Fault Indicator
MV Line
Network diagram for Undergrounds cables
Bill of Material
Protection System
Ground Works/Off site
UG Construction
OH Construction
Introduction
Change in Short Circuit
System Protection
MV Lines to be moved
New housing estate