BIM Implementation Plan)
Architecture Studio - PROCESS MAP, Communicate,…
-
Communicate
01 Visualize: create a Inforgraphic map to show how BIM uses will be implemented between departments; content to be presented in layman terms; show case data of efficiency archived between AutoCAD to Revit
02 Transform: get ownership, designers, and architects feedback on the templates, standards, and policies - what is working and what is not?
03 Draw: review drawing sets with team members of annotation and details between architecture and interiors; consistency to remain with each discipline
04 Document: locate a drive to where information will be easily accessible to all parties within a firm. Designate a point person as QA/QC to review drawing sets, specifications, and presentations prior to submitting to client
Realize
01 Fabricate: create standards to divide work into packages for construction. This includes IFC, DWG, and PDF; use a pilot project to test the efficiency of project during construction
-
03 Control: create AIM model as a final product to client using COBie for facility management. Create inhouse standards and templates for client use; both for architecture and interiors
-
Gather
01 Capture: review the existing project creation method before implementing any changes between architecture and interiors department
02 Quantify: review various drawing sets to quantify average number of drawings, specification, and presentations produced in the architectural design studio
03 Monitor: analyze the amount of time it took to produce drawings with current software (AutoCAD), specification software, and client presentations
04 Qualify: create a dashboard using Smartsheet or equal to log findings, and showcase the current performance of the two groups (Architecture & Interiors) of project information to upper management (ownership)
Generate
01 Prescribe: provide a BIM methodology to the group and outline the synergies between architecture and interiors and the method in which the drawings will be produced in the "level of information need" based on SD to CD phases
02 Arrange: create templates and pre-made standards for the group to follow for each project to align them consistency and efficiency for each project. For interiors group - use cloud based platform that are intuitive to use
03 Size: the office does medium to small size projects; therefore, the same 3D modeling templates can be used for each project
Analyze
01 Coordinate: run a pilot project to test the group understanding of the templates and procedures; gather issues and concerns during the process
02 Forecast: create a BIM uses learning curve to showcase ownership of the time it takes/took for the group to be fully integrated in BIM methodology
03 Validate: review the models completed by the groups to ensure modeling accuracy, templates are followed, and standards are understood
-