Please enable JavaScript.
Coggle requires JavaScript to display documents.
Culvert relation to fish population (upstream vs. downstream), Equipment…
Culvert relation to fish population (upstream vs. downstream)
Salmonid species Diversity, composition, and relative abundance
Fish Trapping
species
fork length
count
**WATER QUALITY
Date
Time in, time out (CPUE)
depth of set
GPS *auto on trimble
Culvert construction as a factor (already collected through summer survey)
Size
type
Other factors
Rehabiliton
Fish passage infrastructure
Length
Slope
Diameter/Rise/Span
fill (shallow, deep, artificial)
Material
debris infrastructure?
Eliminate habitat/environmental factors present @ culvert sites
water quality
pH
conductivity
temperature
substrate
method for collecting
100 pebbles
b-axis
vegetation
canopy cover
species composition
*
Look through FHAB for vegetation assessment
FHAB
Bankful width
bankful depth
wetted depth
wetted width
gradient/slope
Habitat units
*
Equipment needs
Gee Fish Traps x 30
Fish Viewer x 3
Buckets (Dark) x 2
Geo 7
Clinometer
Eslon Tape
Thermometer
Wooden Measuring Staff
Flags for marking locations
Flagging Tape
Bubbler
Small Dip net/Bait Net
Bait (cat food/trout bait)
Bait container
Fish ID Books/Laminated sheets
TruPulse 360R Range Finder
Water quality Multimeter PCTSTester 50
Luggage Tags for Permit #
scale
Expenses
Trapping:
Tea Diffusers
Catfood/Bait
Driving/Gas
Lamination of field guides (Fish ID)
Analysis
Permit Requirements
general
license #
sampling date/time
crew
stream name/watershed code
gps position
number
individuals
weight
length
species
CULVERT SELECTION
Culvert/Streams (different based on type)
3x Concrete
3x CSP
3x Poly