Please enable JavaScript.
Coggle requires JavaScript to display documents.
Work Area Hazards - Coggle Diagram
Work Area Hazards
-
Electrical
-
-
-
-
Electrical Tool
-
-
-
If Max Length reached, sub-mains used
-
Objectives
-
-
-
Achievement
-
Practicality of using code of practice, reg. and standards
-
-
-
Excavation
-
Preparation
Clear signage (barricades, warning signs)
-
-
-
-
-
Appropriate supervision, training and instruction
-
-
-
-
Heights
-
-
Prevention of Falls
From Perimeter, through roof spacing b/w rafters >600mm, through the roof (weak and asbestos)
Requirements
If >2m, fencing or safeguards in place
-
Control Measures
-
Temp work platforms
-
-
If >4m, erected by certified, tagged <30 days
-
-
Material handling <4m if conductive, <1.5m if non-conductive
-
Fall-arrest Systems
If PUBU implement FAS, emegency protocol and rescue procedures
Info, Instruction and Training to Emergency Protocol
-
-
-
Ladders, 4:1 slope, fully opened and secured (both or either ends)
-