Electricity Generation Fron Non-Conventional Renewable Energy Source (…
Electricity Generation Fron Non-Conventional Renewable Energy Source ( NCRES) :check:
NCRES
NCRES
Colombian Electricity Generation 66% Hydroelectric and 33% Gas/Coal powerd plants
NCRE Currently generation capacity 0.7% of total EGC
Colombian Electricity Mix Generation 2017
NCRES implementation contribute to satisfy the futere growth and seasonal fluctuaction that afeects the hydroplant and elevate the cost of the Gas-Coal powered plants
Hydrological Variability
LAW 697 & LAW 1715
Annual income tax deductions
VAT exemptions in use of energy derived fron NCRES
Exemptions on import taxes in new NCRES projects
Accelerated depreciation of assets for the generation of energy from NCRES
No mandatory targets have been set for NCRES
Great natural resources
Wind energy --27000MW
Photovoltaic Energy --4.5 KWh/m2/d
Small Hydroelectric Plants--Less than 10MW
Energy fron Biomass--793 MWH
Forecasts of electricity
Two scenarios of EGC integration from NCRES
Registration of Electricity Generation Projects
using NCRES in Colombia
Phase 2: Technicla,economical and enviromental feasibility
Phase 3: Full designs
Phase1: Pre-feasibility
Forecasts of NGC Based NCRES through Projects
Currently Registered at UPME