Isolation of RST022?
NM +HB Foam Drill Collar
MA was setting up exclusion zones
MA connected the water hose between ST and Rig
MA said he isolated the ST but did not lock it out
AT sent to reg rid of rubbish in LT
AT set up BT with hoses and confirmed isolation
NM moved ST into position with HB spotting :
NM arrived back at the rig
Pad Move
AT backed up Rig to Pad with HB spotting
MA moved LT
HB Moved St
1 more item...
16:30 Winu 0964 Move and set up
MA refueled rig with ST
HB, MA + At Grouting in casing
1 more item...
Rig was set up, Mast raised jack legs down
NM then moved BT into position
NM +HB running rods into Precollar
EOS 17:45 Hours
Teuesday 06/07/21
06:00 Prestart Meeting
Crew dropped off at rig
06:20 HB Prestart on Rig
06:30 Rig 4 Isolated
07:00/08:00 HB replaced isolation tags with current tags
08:15 SA rig visit
2 more items...
Locked for Maintenacne
NM + LF removed rig Thermostat
1 more item...
cross shift crew required the LT
Removed supplies out of LT for the day
Food, Water, Batteries, PPE
hole to 56m (2m off bottom)