Please enable JavaScript.
Coggle requires JavaScript to display documents.
WBS - Coggle Diagram
WBS
Pre-Construction
-
-
Installation of working facilities (offices, toilets, power)
-
Suppliers contracts
Particular attention when choosing the building materials, since we want to mantain high sustainability low-environmental impact materials are preferred
-
Mechanical, Electrical & Plumbing
Installation of electrical circuits, lighting sysytems & internet cabling
Installation of piping systems, roof drains, waste pipes & firefighting systems
Installation of HVAC systems (heating, ventilation & air conditioning, gas lines & security implants
To respect the sustainability requirements the mall will be built with solar panels, will run on renewable energy produced by photovoltaic panels, will include a particular hydraulic system recygling part of the used water which can be reused for the green areas as well as for sewage
Land & foundation
-
-
Building the foundations & setups for moving materials(cranes, easy acces for working machinery)
Finishes & Closures
carpentry works (doors, tiles, caroeting, glassware)
-
Final touches and furnishing of the buildung, of the shops and any other area of the mall
-
-
-