Please enable JavaScript.
Coggle requires JavaScript to display documents.
DCP Cycle Time Admixtures - Coggle Diagram
DCP Cycle Time Admixtures
Adding Water externally -
6-7 mins of PC adding 200 L
Modifying Water Pipeline
Using the Filling branch
Adding Water & PC & Sending Faster with a better Pump
Filling
Adding another Branch
Adding RM - workstation Design 5S
Kostik Soda Preparation - can ben done in Filling Tank (35 mins / batch)
Planning
Daily Plan
Urgent / Priorization
Filling without waiting QC ; 10 mins (Above 99%)
Deviations from Standard
Waiting for Forklift
Waiting for IBC
Waiting for Tanker
Correction
Water Availability
Increasing Water Tank Cap
Pump