Estimated Starship Development Schedule
Orbital Launch Table Built 100%
Table moved to Orbital Launch Site
Table Mounted on top of 6 Leg Stand
Table 99% Complete on Stand
Test Water Deluge System Test
Orbital Launch Site Ready for Ship 20/Booster 4 Launch
Raptor Installation Platform Operational 30%
Orbital Cryo Tanks Built 100%
Cryo Tanks installed 86%
Cyro Tank Farm Piping Installed
Tank Farm Testing Started
Tank Farm Testing Completed
All Integration Tower Sections Assembly 100%
Tower Sections at Orbital Launch Site 100%
Tower Sections Stacking 100%
Lighting Arrester Installation on Top of Tower 0%
Tower Columns Welded Together 83%
Tower Columns Filled with Concrete 0%
Catching Arm Installation 90%
Starship Lifting Crane Operational 20%
Quick Disconnect (QD) Arm Installation 100%
QD Arm Exendtion Installation 85%
FCC Approves SN20 and BN4 Flight
Telemetry
FAA Authorizes Ship 20 and Booster 4 Orbital Test
Initial Orbital Test Flight Completed
FAA Authorizes Ship 21/Booster 5 Orbital Test
2nd Orbital Test Flight Complete
Continued Orbital Testing
FAA Validation of Cargo Starship Started
Cargo Starship Certified for Commercial Use
Lunar Starship Certified for Commercial Use
2 more items...
Tanker Starship Certified for Commercial Use
1 more item...
Kong Crane Assembly 100%
Starship Prototype Testing
SN16 in Storage
SN15 Testing Complete
Suborbital Testing Complete
Ship 20 Assembling 100%
Ship 20 Testing 20%
Ship 21 Assembling 20%
Ship 21 Testing 0%
Booster 4 Assembling 100%
Booster 4 Testing 10%
Booster 5 Assembling 20%
Booster 5 Testing 0%
SN17 Scrapped?
NS18 Scrapped?
Cryo Tank Bases Built 100%
Buckner Yellow Heavylift LR11000 Crane Assembly 100%
Cryo Tank Shells (CTS) Built 100%
CTS at Orbital Launch Site (OLS) 57%
CTS Installed 43%
Booster Thrust Simulators Built 95%
Simulator Moved to Launch Site
Wide High Bay Construction 5%