SAFETY DOCUMENTS AND PROFESSIONAL
PROFESSIONAL
coordinator for safety and health matters at the project preparation stage (CSP)
The CSP must assess that the work in the design phase follows the safety regulations
obligations
calculates the cost of safety measures and prepares the
project technical file
He prepares a dossier adapted to the characteristics of the works
draws up the safety and coordination plan PSC
Client
obligation
Check the technical file of the CSP
Send preliminary notifications
appointment thye work supervisor
The client can transfer his obligations to a project supervisor
Role
the person who commissions the construction of the building works
Look for a designer
Choose the companies and agree on the tender specifications
coordinator for safety and health matters at the project execution stage (CSE)
obligations
Check the eligibility of POS
verify that contractors and self-employed people follow the PSC and coordinate relevant arrangements.
He informs the client or project supervisor of any cases of non-compliance with safety
work supervisor
oversee the work that is performed
appointment by clinet
He verifies the performance of the work
SAFETY DOCUMENTS
techinical file
It is drawn up by CSP
it is updated by the CSE
The technical file contains information about the prevention of and protection against the risks, during any subsequent work on the building.
The technical file of the work is divided into 3 chapters
site safety plan
(POS)
it is the document that the employer of the contractor draws up for the single site concerned.
it is drawn up before the start of the works
The contractor company verifies the congruence of the POS of the executing company
contents
The description of the activities
Dangers
The identification data of the company and secretary
The DPI
Safety and coordination plan
(PSC)
PSC is a document must be drawn up by CSP and is updated by the CSE.
This is mandatory for construction sites
Contains it
It provides for the procedures, preparations and equipment necessary to comply with the regulations
contains the risk prevention measures resulting from one or more companies
Identify, analyze and evaluate risks
emergency response plan
it is a document containing information or execution to defend against an emergency
An emergency is an unexpected situation that can result in accidents or injuries
purpose
limit the damage
allow evacuation
guarantee the intervention of the rescue services
The plan must be updated periodically
Prior notice
it is a communication that has the purpose of informing the competent supervisory bodies
It is sent by the client or the construction supervisor before the work begins
Contains information on the construction site
contractor
appointment
site manager
The site manager has a managerial role and is have the responsible for guaranteeing the safety of workers.
site foreman
The site foreman continuously monitors the execution and performance of work
What is it
is the company that has been awerded the contract whit the client.
The contract can use the service of sub-contractors
self-employed person
are employees of the contractor or of the
sub-contractors. they have the role of implementing the safety and coordination plan and disposing of PPE
Prepare a site safety plan