INTERIOR PROJECT MANAGEMENT
CUSTOMER REQUIREMENT
SIte Location
Site Status
Floor Plan
Requirement
Advance
Customized
Basic
SCOPE
Scope List
Living Area
False Ceiling
Loose Furniture
Wall mount
TV Unit
Chandelier
Bedroom
Cot with Side Table
Wall Panel
Wardrobes
Tv unit
Loft
Dressing Area
Computer Table
Wall Mounts
Coffee Table
False Ceiling
Loose Furniture
Pooja Unit
Kitchen
Wall Unit
Utility Area
Wet Area
Base unit
Tall Unit
Loft
Dinning Area
Crockery Unit
loose Furniture
False Ceiling
Foyer
False Ceiling
Wall Mount
Loose Furniture
Additional Scope List
Painting
False ceiling
Tiles
UPVC Windows
Glass Fabrication
Steel Fabrication
Customer Approval
BILL OF MATERIAL /QUANTITY
Quotation Approval
10% Advance
Quotation
DESIGN
Cost Devation
Design Approval
Cost Devation Approval
Procurement List
Cost Of the Material
Cost of the Labour
30% Billing For Material Procurement
EXECUTION PLAN
Time Management
50% Billing
QUALITY CHECKING
PROCESSING STAGES WISE
QUATION APPROVAL
DESIGN
QUOTATION
DESIGN APPROVAL
BILL OF MATERIAL
COST OF DEVATION
SCOPE SHEET
COST OF DEVATION APPROVAL
SITE VISIT
PROCUREMENT LIST
REQUIREMENT
EXECUTION PLAN
QUALITY CHECKING
BILLING
SITE VISIT
BILLING