Demolition
Before demolition
Setup perimeter
Fences
Securing site
Public safe
Early investigation
main electricity is still alive
Cut cable
Remove electric on site
Send a letter to public
Process demolition multi-storey
The set up of process of demolition for an excavator going up
The excavator will be carried by a crane to the top of the buildind
The excavator had been carried by a crane
The excavator starts the process of demolition
The excavator destroyed and throw the structure from the top of the building