SUSPENSION ROOF - Coggle Diagram
SUSPENSION ROOF
-
-
INSTALLATION
-
5) MEMBRANE INSTALLATION
first step, open the membrane over protective materials at ground level and to hoist it in a position
second step, land the folded membrane bundle on temporary ropes and deploy it in the air
third step, when the membrane has deployed it will be fastened over the previously established structure
3) CONFIRM THE INTERFACE
Confirming that all interfaces to which our structure is connected are within tolerance and that any mechanical fasteners are set to the proper elevation or dimension
6) DETAILING
the closures will be installed, cleaning and touch up will be completed and quality control inspection
-
1) MOBILIZATION
includes site inductions, safety analysis, trade coordination, receiving equipment tools and material
-
-
1)HYPAR
-
-
-
-
2) CONIC
-
3) BARREL VAULT
featuring double curvature,it can only be created with aluminium, steel and timber
-
4) INFLATABLE
-
infaltable cushion, created where constant air pressure form fabric to shape
-
MATERIAL
1) STRUCTURAL COATED FABRIC
-
provides water proofing color and required technical characteristic such as UV resistance, flame reterdancy and welding ability
-
2) MESH FABRIC
made of cloth coated with spacing between the treads bundles with some meshes the threads are coating before weaving due to the openes factor ot the meshes
primarily used as shading light and provides waterproof finish with a high level of light transmission
EXTERNAL USE FABRIC
1) PVC COATED POLYSTER
-
-
relativeky inexpensive has reasonable structure strenght,
-
2) PTFE COATED GLASS CLOTH
-
-
-
-
-