Please enable JavaScript.
Coggle requires JavaScript to display documents.
Shell HT31 trailerized design - Coggle Diagram
Shell HT31
trailerized design
Philosphy
HT31 skidded LNG fueling station basis
Full Fuelling Station
Functionlity
unmanned operation
min. 40 trucks a day throuhput
no unloading for operation needed
LIN BOG included
Control System included
Function Safety excluded
Approval to unit
Purpose
Maintenace campaign backup station
New markets exploration unit
Peak shaving unit
Design
Modification to HT31 skid
LIN system
LIN tank to provide Instrument Air
LIN tank to LNG BOG line routing
LIN off-load point reposition (height)
LIN level/pressire gauge reposition (height)
AirLiquid FWES integration
LIN tank to trailer anchoring
EC instead of PC3000
(liquid transport approved)
LNG/LIN
vent stack
Crain-less installation
HT31 frame to trailer anchoring
LNG off-load point
reposition (height)
Off-load connection
HV2301 & HV2305
Off-load panel
Smart grounding
ESD interlink socket
LNG level/pressure gauge
PI2301
LNG dispenser
Removing purge unit
Second nozzles holster (height)
ESD, DMB & ID buttons on remote panel
:question: display readibility