Please enable JavaScript.
Coggle requires JavaScript to display documents.
Technical Product Management, There can be overlapping between technical…
Technical Product Management
Maximize energy Production
Minimize downtime
Reduce Cost
Reporting
Customize frequency
Adhoc frequency
Based on some events or customized time frame
Site Visits and non-intrusive inspections
(Assess O&M performance)
Visual Inspections
Aerial Inspections
Ancillary service management
Interface with local energy authorities and regulatory compliances
PPA
Power generation license agreements
Aggregator liasoning
Production forecast
Unavailability schedule
Grid unavailabilty info
Plant shutdown requests
Warranty Management
Warranty of Good Execution of Works
Pending Works in the EPC phase
Insufficiencies in works
Defects
Failure or malfunction of any equipments
-Modules
-Inverters
-Power Transfo
--Any other equipments
Anomalies processing and repository
Warranty of Equipment (Product)
Performance Waranty
PR/Other KPIs calculation
Manage Intervention
Reporting to Asset Owner
Periodic
Adhoc
Insurance Claims
Asset Optimzation
Plant Performance
Operation Cost reduction
Repowering and Revamping
Technical Training
Repowering and revamping
Component failures/underperformance
Technological imp
There can be overlapping between technical asset management and O&M