Energy management
Carry out on site inspections and energy surveying
inspecting and reviewing energy levels being produced at the solar panels
checking for energy levels being received at the complex
Inspecting the solar panels on the roof and on the ground
Checking for power and energy loss
Checking for power loss and leakage
inspecting the Buoys at sea
Checking the energy levels being received at the complex
inspecting and reviewing energy levels being produced at the turbines
Inspecting and reviewing energy levels
inspecting wind turbines on site
checking levels at the complex
Checking for power loss
Assembly of the OE buoys
Bringing out the Buoys to the area
Checking the seabed for debris or waste
Clearing the area of large debris and rocks
Connecting each buoy together under water
Boating out to location in the sea
Installing the blades onto the turbines
Traffic control for the duration of the assembly
Checking the turbine blades working correctly
Placing construction notices and walls around the area perimeter
Connecting the Buoys to its own personal grid
Testing on land of the power produced
connecting to the Grid(Wind turbine)
Placing construction notices and walls around the area perimeter
Traffic control for the duration of the assembly around the area
Digging the holes for large pipes to go from turbines to the complex
Connecting the pipes to the already establish pipes in the area
Wind turbine are connected to the overall grid
Digging up the area for the pipes to be connected to the complex
Testing the energy and power levels at the complex
The complex is connected to the wind turbines
Recovering of the pipes will the dug-up soil
The pipes are covered, and nature is continuing
Planting grass and flowers on the land covering the pipes
Connecting to the Grifd (Wave energy)
Connecting the pipes to the already establish pipes in the area
OE buoys are connected to the overall grid
Digging the holes for large pipes to go from turbines to the complex
Digging up the area for the pipes to be connected to the complex
Testing the energy and power levels at the complex
The complex is connected to the OE Buoys
Traffic control for the duration of the assembly around the beach area
Recovering of the pipes will the dug-up soil
Placing construction notices and walls around the area perimeter
Planting grass and flowers on the land covering the pipes
The pipes are covered, and nature is continuing
Connecting to the Grid (Solar Panels)
Digging up the area for the pipes to be connected to the complex
Testing the energy and power levels at the complex
Solar Panels are connected to the overall grid
The complex is connected to the wind turbines
Connecting the pipes to the already establish pipes in the area
Recovering of the pipes will the dug-up soil
Digging the holes for large pipes to go from turbines to the complex
Planting grass and flowers on the land covering the pipes
Traffic control for the duration of the assembly around the beach area
The pipes are covered, and nature is continuing
Placing construction notices and walls around the area perimeter
Assembly of the wind Turbines
Placing construction notices and walls around the area perimeter
Traffic control for the duration of the assembly
Ripping up and digging ground for the turbines
Removing water from the site of operation
Pouring the foundations into the holes and letting it set
Installing the lower parts of the turbine into the ground
Installing the top parts of the turbine into the bottom parts of the turbines
Installing the blades onto the turbines
Checking the turbine blades working correctly
Connecting the wind turbines to its own personal grid
Assembly of the solar panels
Placing the solar panels with cranes in sections at an elevated height
Connecting the panels together on the ground
Clearing the surrounding areas of rubbish, debris and materials that block the sun
Removing any covers or devices blocking the sunlight
Wiring the Panels back to the electricity box
Testing of Panels
Placing construction notices and walls around the area perimeter
Leaving the wiring there to connect further down the line
Traffic control for the duration of the assembly around the beach area
Connecting the Panels to its own personal grid
Transporting Solar panels
Leaving the Cargo container on the cargo ship
Transporting the cargo from Shanghai to Dublin port
Arriving on the cargo ship
Collecting the cargo container from Dublin port
Going through customs checks
Driving from the Shanghai factory to the port
Collecting the Solar Panels from JinkoSolar Holding co in china
Custom checks in Dublin Port
Driving from Dublin to Galway
Disembarking the cargo at the site
Transporting OE Buoys (wave Energy)
Transporting cargo from America to Ireland on the Cargo Ship
Disembarking the truck from the cargo ship
Loading up the Truck onto the cargo ship
Driving from cork to Galway
Driving from Florida to the Port
Dropping of the cargo at the site
Transporting the Buoy from Oregon to Florida
The cargo arrives on site
Picking up the OE Buoys from Oregon (America)
transporting Wind Turbines
Picking up turbine
Trucks are transported by cargo ships to Ireland
Trucks arrives at the Port
Transporting Turbine from Pensacola to Florida port
Driving from New Orleans to Florida port
Trucks transport the turbines from Cork Port to Spindle
Picking up turbine blades
Wind turbines arrive at the destination
Prepare detailing schedules and cost estimates
Meetings with the Architect, project manager and Building constructor
Ringing of the Specialists
Discussing the start date with the builder
Meeting with the Solar power panel technician
Meeting with wind turbine technician
Meeting with the wave turbine Technician
Call with ESB about Grid