4.2Bored Piles
Bored Piles
-
Advantages
-
Less disturbance (noise ,vibrations) to surrounding structures or population
High capacity pile, thus a single bored pile may be used instead of a group of piles.
-
Can be installed to great depths, more than 100m
-
-
-
BCA Guidelines
• In Singapore, old piles are frequently left in the ground after
buildings have been demolished, to make way for en bloc
-
• It is often difficult, costly and even risky to remove the old
-
-
-
-
-
-
Issues in Bored Piling
-
-
-
Pile Eccentricity
-
-
To fix, add additional pile or enlarge pilecap dimensions
-
•If the individual pile position in a pile group exceeds the 75 mm eccentricity, but the pile load < pile working load capacity, then the Pile Group Eccentricity point is within the safe zone.
-
BCA Req.
Pile layout plans
-
-
-
-
-
-
-
-
the sectional details of piles, number and type of pile load tests and the location of the ultimate pile load tests.
Req. for piling
Appointed Qualified Person , QP(ST) is required to stipulate the allowable vibration level
A vibration monitoring layout plan with the allowable vibration level stipulated is required to be submitted to the Commissioner for record before work commences
-
-
Types of Bored Pile
-
-
Micro-pile
Uses
-
-
-
-
This pile option will help you underpin your foundation, minimize foundation settlement, and are ideal when installing in areas with difficult soil makeup
-
-
-
-
-
Summary
This pile option is one of the most practical and cost-effective solutions. It offers easy installation with its compact, lightweight nature, and is great for confined or remote areas like steep slopes, basements, overpasses, and even river pier foundations and wetlands. It also can be installed at various angles and is capable of resisting axial and lateral loads.
-
Tests Done
-
Pile Load Test
(PLT)
What is it
Test done to verify the structural and geotechnical soundness of pile and also to predict settlement in other piles
Usual procedure is to increase load put on pile in stages until proposed working load and a certain factor of safety is reached then unload and leave load off until rebound or rise substantially ceases
-
-
Types of tests done
Ultimate Load Test
-
Conducted to 2.5-3.0 times the working load, or until failure of pile
-
-
-
-