Technical meeting 04.02.20
Glass
Arrival MAY
JUNE-JULY Installation
AUGUST
Screens
Insect netting
Crop wires
Final leveling
Hanging gutters
pipe railes
Hoses and drippers
Actual
Greenhouse
Packing
2B Foundation pins
Machinery / Platforms
Services
Entrance
Security
Medical clinic
CCTV
Automated acces devices
Luminaires
Security service
Materials warehouse
Racks
Ground cover
Lunch area / WC
Energy
Electrical installation
Connection to grid
Temporary
Gasoduct
Packing
Pscking lines % Logistics
Concrete floor
People
Manuel García
Roberto Campos
SB
Administrator
Safety Guy
Nurse
COVID 19
Engineering
Logistics: Containers and workers at ports
Supervisors
VB
PRINS
Technical services
Heating & CO2
Regulation & Measurment gas station
HST/ Boilers room
Irrigation
Irrigation room
Water silos
Infrastructure