Moving Electronics Lab KE-424 to Grangegorman
Disassembly of Machines
Select the appropriate tools and equipment
Dismantle items
Inspect each electrical component/equipment and analyse task requirement
Mark electrical components to aid in reassembly
Isolate and tag circuits and equipment in accordance with procedures
Organise for easier packing
Items ready for packing
Use appropriate personal protective equipment (PPE)
Disconnect all machines
Packing
Fragile items must be wrapped with a bubble wrap
Label wirings and equipment
Clean before packing machines/components
Lay a sheet or two of clean packing paper on the bottom of each box for extra protection
Determine right size of boxes to be used
Put a few lengths of packing tape at the bottom to avoid the possibility of accidental breakages
Deciding on packing procedures and layout
Close boxes with good quality packing tape
Boxes are ready to be moved
Observe all fundamental safety packing techniques
Moving
Add straps to pallet
Use pallet truck to move big boxes
Wrap pallet in cling film
Move to truck
Have a planned route
Ensure that all tech equipment are moved first
Categorise boxes to move
Load in orderly fashion
Give detailed floor plan to the movers
Prepare to move boxes to Grangegorman
Installation and Commissioning
Ensure system is set in a safe condition
Ensure safety of attachments of each machinery
Assemble in accordance with Manufacturer’s Instructions
Check all electrical connections
Positioning and securing of equipment and components
Start up system / machine slowly
Use appropriate personal protective equipment (PPE)
Continue to build up to full operating pressures, loads, speeds and ranges
Check fragile items for proper handling
Compare established system / machine to required operating and manufacturer’s specifications
Equipment/machines/components ready to be used
Unpacking
Check labels of each boxes for organisation
Move boxes to new lab room
Remove equipment from boxes
Situate furniture and big equipment first
Report any damage
Ensure fragile equipment are safe once in the room
Ensure items are placed in the right locations
Decide where to put everything
Check if all equipment have been moved
Prepare for assembly
Planning the Move
Order boxes and packaging in advance
List down equipment to be moved
Schedule movers
Date for the move
Getting paperwork done such as permits, license
Hire truck
Place orders for new furniture and stationery if needed
Arrange disconnect & reconnect of services
Prepare to disassembly machines