Please enable JavaScript.
Coggle requires JavaScript to display documents.
Management of construction waste - Coggle Diagram
Management of construction waste
PROBLEM
Waste is one of the serious problems in construction industry.
A large and various types of waste with different characteristics are created at all the stages of construction right from site preparation
CAUSES
The increased economic growth as well as urbanizationhas led into extensive
81 factors forcausing construction waste and clustered in 7 groups of factors:
Namely design of project
Handling ofconstruction materials
Equipment
Construction workers
Project management
Site condition
Procurement of materials and external items
CONSEQUENCES
All round the world construction materials generate million tons of waste annually.
Some hazardous materials may not be moved
POSSIBLE SOLUTIONS
The materials management system in any project insure that the right quality of material
and quantity of materials are appropriately selected
Manage the waste at every stage or phase of construction project
Classification of waste
Disposal technologies for waste.
Management strategies for waste