BIM, Conclusion, Less Carbon Emissions - Coggle Diagram
BIM
Intro
Problematic
Trojan horse
Trap for designers
Indirect Extra Scope
BIMCUBES Team helps you alleviate this extra scope
by providing support for all disciplines at all design stages
by being your BIM Manager and overseer in front of client representatives and their unclear demands
by providing you with extremely powerful AI tools to empower your work
BIM Management
Because of our coverage of all design and construction phases during BIM support, our BIM management is WELL INFORMED
and we will use that to defend you in front of illogical client demand
BIM AI (Explain all our process)
Aligning to norms
Enriching BIM Model with Specifications
generate BOQ
Change Management
4D BIM Simulations
generating ressources 5D BIM
generating carbon footprint 6D BIM
generating tasks on PRIMAVERA or MS Project (Resource loaded tasks)
Visualizing task generation 5D and 6D BIM Simulation (1 slide)
BIM Support
ARCH Schematic design: New Cyprus Museum
Challenge: winning the competition in 2 weeks and with 3 people only
DD and CD
Rennovation and Interior Design: ZM
Challenge: capture the exact quantities that need renovation in contrast to new build.
Integrate a new internal structure.
Integrate new mechanical systems.
Architecture: Norman Cay
Challenge: everything needs to be prefabricated without any mistakes because the cabins need to be built on virgin islands. One mistake could have enormous repercussions.
Structure: renad
MEP: Charonne
Shop Drawings: AQUA RAFFLES
4D and 5D BIM: Lusail CP7B
Challenge: Create 4D simulations and integrate 5D data into an ERP in order to coordinate with constructions planners & quantity surveyors.
Conclusion
Higher Project Quality
Lower Project Cost
Less Project time
Less Carbon Emissions