Design Process Starts
Surveying Works
Existing Site Levels
Existing Surface Model
(Convert 2D to 3D)
Grading Model
Add Roads Elemets
Road model
External Works Model
Add LSC Elements
LSC Model(s)
Coordination with Master Planner for final design
Existing Utilities
Convert Existing to model
Add Design Components
Combined infra model
Existing Building Drawings
(Hotel & serv., Villas, Residential)
Existing Arc
Convert 2D to 3D
Base Existing model
Add Design Elements to model
Base Model for work
Share to MEP
MEP Models
1 more item...
Updated ARC Design models
Add MEP Requirements
STR Works Starts
STR Models
Demolition Package
Space Program & AOR Req.
Existing STR
Convert 2D to 3D
New Design Buildings
(Luxury Villas)
Base Model ARC
STR Works Starts
STR Models
Add Design Elements to model
Base Model for work
Share to MEP
MEP Models
Updated ARC Design models
Add MEP Requirements