Formwork and falsework

Definition

Material

Good form work

Failure of formwork

Timber

Plastic

Steel

Disadvantage

Advantage

Tightness

Simple Election and stripping process

Strength

Design

Advantage

Disadvantage

Simple design

making it more flexible

Light and easily handled

to faciliate minor change

prevent the loss of grout

Grout

Advantage

Disadvantage

Making it more efficient

Erection process refer to formwork installation process

stripping process refer to formwork dismantling process

Formwork

A mould where fresh concrete can be poured into it and harden to its intended shape

Falsework

Reason

Inadequate design

collection of container that receive concrete mix

Refer to a mixture of water and cement

serves as critical element for binding the concrete

Chosen based on

Cost of material

Availability of skilled worker

Structural form

Speed of construction

Number of reuse

Construction tolerance ,rigidity and accuracy

Finishes required

Easily obtained

Cheapest in first cost

Easily handled and transported

Able to take considerable load

Low life span

Required skilled labour

Timber absorded water which reduced the strength of concrete unless it is sufficiently wetted

Surface is affected by the concrete after serveral reuse

Highest deflection of the 3 material

Striking of formwork

Type of formwork

Modern

Conventional

Unless well finished it gives a rough texture to the concrete

Strongest of material

Most durable

Produced good fair face finish

Easily assembled as it more mechanical

Initial cost is high

Suitable for forming right angles but difficult to form curve

High thermal expansion and contraction

Durable

Easily repaired when damaged

Forming circular & irregular shape

Cannot be used in high temperature extreme

Production cost is high unless produced in great quantities

Impact

Result in injuries and death

Recovery cost and downtime due to such failure will cause adverse impact to the project schedule

prevent such failure

Supervisor is required

to supervise erection,alteration or dismantling and inspection of form work

To attend mandatory formwork safety course for supervisor

Improper stripping and shore removal

Inadequate bracing

Vibration loads

Unstable soil under mudsills

Shoring not plumb level

Inadequate control during concrete placement

Lack of attention to formwork details

modular in shape

For efficiency and speed

Type of modern formwork

Table form/Flying formwork

System formwork

Slip formwork

Tunnel formwork

Foundation form work

Column formwork

Slab and beam formwork

Wall formwork

Staircase formwork

Serves as a mould for wet concrete

enabling it to harden to the desire size and shape of the finished reinforced concrete structure or component

Supporting system for formwork mould of a structure which is cast above ground level

System which locate and retain the formwork

in the desired position in a stable and safe manner

process of removing the formwork from the surface of the hardened concrete

Once the concrete has achieved the initial recommended strength to support both the dead and live load

Soffit

underside of slab ,beam and similar structural component

click to edit

usually place in a longer period of time and is removed last in the form of slab and beam

Miniumn period to removed

vertical formwork

1 day

Soffit of slab and beam less than 500mm thick

3 day

Soffit of slab less than 500 mm thick

7 days

Soffit of slabs more than or equal to 500mm thick

depend on concrete material

soffit of beam

3days

Soffit of cantilever beam and slab

7 days

props to slab and beams

14 days

props to cantilever beam and slab

21 days