Landfill Operation and Management
Process
Waste collection
Waste weighbridge
Waste dumping process
Waste compaction process
Daily soil cover
Capping / covering process
Type of covering operation
Daily operations
Carried out after the daily portion of tipping
Intermediate operation
Carried out as the landfill progresses helps in reducing leachate . No dump will be raised more than 10 meters.
Final covering operation
It is laid when the cell is full and depends on the future purpose of the site. A minimum cover thickness of 60 cm
Factors
Stability analyses of the waste body;
Waste placement techniques, phasing and supervision;
Settlement and other types of deformation, checked by monitoring programmes;
Operating facility, buildings and roads;
Gas management and monitoring programmes;
Surface water and drainage;
Leachate management and groundwater control;
Environmental concerns, i.e. dust and noise emissions, etc.
Mohamad Saifullah Bin Abd Hamid 2017632158 EH2208B