Landfill Planning
Landfill layout, construction and design
Landfilling Methods
- Excavated cell/trench method
-
Construction Factors
- Protection of components already constructed; in particular, sealing layers and drainage blankets
- Minimum dimensions required for construction work
- Simple and non-sensitive design and construction
-
- Availability of construction materials
-
-
-
Gas control facilities
- Quantity of LFG must first be estimated before determining the size of gas collection and treatment facilities
- Several rate should be analyzed as different operating procedures produce different rate of LFG
- Horizontal or vertical gas recovery well depending on design and capacity of landfill and opportunity to sell power.
-
-