V-Block Procedure
1.Purpose
Define
What is V-block
Why installed V-Block
Requirement
To making water way
Expectation
Proper installation
Good quality of fabrication
2.Scope of work
I.Installation
1.Contractor
Design
Supply material
2.Company
Define location
Review
Approval
II.Fabrication
1.Contractor
Design
Supply material
2.Company
Review
Approval
6. Role and Responsible
I.Fabrication
A.Contractor
Fabrication Team
1.Role
2.Responsibility
3.Define RASCI matric
B.Company
Company representative
Responsibility
1.Role
3.Define RASCI matrix
II.Installation
A.Contractor
Installation Team
2.Responsibility
1.Role
Define RASCI matrix
B.Company
Company Representative
2.Responsibility
1.Role
Define RASCI matrix
7. Procedure
I.Fabrication
Preparation
I.Contractor
A.Design review
B.Location fabrication preparedness
Equipment preparedness
II.Company
1.Briefing Fabrication team
2.workshop Location Survey
2.B.Workshop check
2.A.Equipment check
2.Production
I.Contractor
Quality Control
B,Tube test fabrication
Tube Test Maintenance
C.Slump test
A.Mixing Composition check
II.Company
A.Random physically check
3.Completion
I,Contractor
A.Tube Compressive Test
A.Reporting
II.Company
A.Witness Tube Compresive test
B.Approval
III.Acceptance Criteria
II.Installation
A. Contractor
1.Survey Location
1.A Check Pipeline postion
1.B Design Installation
1.C Mobilization
1.D Etc
2.Execution
How to install
3.Completion
3.A Demobilization
3.B Reporting
3.C Etc
B.Company
Define installation area
2, Safety matter
2.A.Personnel MCU
2.B.Personel PPE
2.C.Etc