M4-Chapter 1
Master Control Room- 1to 2 ppl
OTHER TERMS FOR MCR
1.Equipment Control Room
2.Operations Control
3.Technical Operations Centre
4.Network Operations Centre
Role
ensure all signals from relevant PCRs are converted to the correct broadcasting formats
responsible for
fibre and satellite
signals
no visual responsibility
of the production
3 Specific Function
reception point for
all programming and commercials
location to
check,modify,ingest
broadcast materials
central point
to distribute the
programmes
Facility Operation Requirements
1.
depends on programming needs
of the broadcast station
2.most stations
invest heavily and depends on back-up sources
for programming and commercials
3.
cable network
that do not need to break into normal programming
4.stations with news department that requires
''live''programming
5.all major news network are mostly run live
6.pre-record some
pre-produced materials
7.a
back-up
on a separate playout server
running in real-time
Production Control Room-24/7,has cam on set,6-7 ppl
Incoming Sources
satellite feeds(video or live) from
foreign news agencies or sources
outside broadcast trucks or cars
repeats live broadcast videos
Transmission Control Room(TX)-1ppl,
LAST PROCESS/FINAL!!
broadcast the final material