Please enable JavaScript.
Coggle requires JavaScript to display documents.
Purpose & Requirements (Purpose (Investigate the site (take detailed…
Purpose & Requirements
Purpose
Investigate the site
take detailed measurements
Research compliance requirements
AS 1428.1
Produce hand and Cad drawn details
Research materials & methods
Requirements
Part A
Project Brief
covering letter
Client Questionaire
scope of service
project planning
fee rates
fee proposal
prelim. agreement
meeting agenda and minutes
Part B
field notes
site measure
Hand drawn - floor plan
Hand drawn - refelected ceiling plan
Hand drawn Details
wall / floor junction
wall / ceiling junction
vanity basin section
Part C
identify existing fixtures and fittings
Part D
produce CAD drawings
floor plan 1:20
construction schedule 1:10
reflected ceiling plan 1:20
interior elevations 1:20
drawing checklist
drawing transmittal
who the drawings will be going to