Construction of Road Layers ( Pavement Work) (Compaction (Consists of : 1…
Construction of Road Layers ( Pavement
Work)
Carried out after the
survey
,
alignment works
,
site clearing
,
earth works
&
temporary drains
has constructed
Drainage layer
Material such as
coarse aggregate
&
fine aggregate
are used
Should be laid and compacted at
moisture content of +1 to -2
of OMC
Laid on a
prepared & accepted subgrade
Subbase
Laid in
100-200 mm
compacted thickness at
moisture content +1 to -2 of OMC
Compaction should produce the density
> 95% maximum dry density
Consists of
natural
or
artificial mixture
such as sand, gravel and
clean
from
organic matter
Roadbase
Crushed Aggregate Roadbase
spread using
motor grader
at
OMC +-1%
laid in
100-200mm
compacted thickness
Compaction should produce the density
> 95% maximum dry density
Consists of
crushed rock
,
crushed gravel
, or
mixture
Bituminous Roadbase
Design, equipment and construction method are comply to
asphaltic concrete
material which are conform to all
asphaltic concrete
section requirement
Surfacing
Asphaltic Concrete
Carried out in a dry weather
After compacting, tack coat is sprayed, wearing coarse will be laid and compacted after that
Binder course
laid
on the
broomed, clean
and
prime coated
roadbase
Compaction
Consists of : 1. Breakdown
Intermediate
Final
Temperature at the commencement of rolling
=> 120 degree Celcius
Operate longitudinal direction with driven wheels towards the paver
Overlapped width is always half width of the roller
Heavy machinery
should not allowed to park
on newly laid mix
After constructing the road test will be conduct to determine the
density, thickness & quality
after 24 hrs
Compaction requirement-
90% roadbase, 95% binder course, & 98% wearing course
Coating
Tack Coat
Material used are
RS-1K (26 degree celcius - 45 degree celcius)
Carried out during dry warm weather
Bitumen emulsion, sprayed onto bituminous layer with rate of
0.5-1 liter/m^2
Prime Coat
Spread on the roadbase at rate of
0.5-1 liter/m^2
Material used is
MC-70 (50-70 degree Celsius)
or
SS-1K ( 25 degree Celcius - 45 degree Celcius)
Cured for
24 hrs
Shoulder
Tickness of the layer should based on
drawing
,
material
used &
compacted
requirement
Level of the shoulder should be
level
&
flushed
and water should
drain
toward the side drain
Consists of
furnishing, compacting & shaping
of the shoulder