GHD Projects (Corridor/Intersection upgrade studies
Future corridor…
GHD Projects
Corridor/Intersection upgrade studies
- Future corridor requirements
- Traffic scenario / design horizon spreadsheets
- Intersection upgrades - safety, PAT, SIDRA analysis and layout and phasing optimisation (network/corridor)
- Turning warrant assessment
- Mid-block requirements
- Cross section development
- PAT - new ped crossings at desire lines, access management, speed reductions, footpath/shared paths
- Traffic lane removal for PAT feasibility - capacity/kerb impacts
- Site visits to observe phasing, local traffic behaviour etc, queuing, risks, lane utilisation
-
-
Victoria Road Bus Rapid Transit (feasibility)
- Corridor study for base, BRT options - sidra network assessment, kerb side impact, intersection layout optimisation, phasing changes etc, testing bus priority, ped improvemets, traffic analysis spreadsheeting / presentation , reporting etc, SCATS data, survey daya processing, complicated intersections arrangements with centre line options, creating new user classes, vehicle geometry, sensitivty testing of model results if general traffic compliance low, cabs use bus lanes etc, boarding/algitngs between KS/CR options and how peds get to stations, sidra settings - lane occupancy veh, PHF, forced phasing vs self optimising phasing (actuated)
-
-
-
Cleveland Rd - HRR - Boundary Rd microsim
- Network building
- Ramp metering - detector, phasing / plans, actuated,metering task and grouping at roundabouts
- Observational calibration that was really useful here was ramp metering activation based on queue length on the congested leg - match to real ICA data to ensure queue length profile activation and length match reality
- Calibration factors - capacity, queue discharge, acceleration, approach/circulating/exoit speeds
- Databse anaylsis - turn ids, turn paths,
NWTC - Options analysis and corridor preservation study
- Concept design for corridor, MCA to sift options, cost estimates, gap analysis, risk analysis
Sydney CBD to Bays
- Investigating travel times of various light rail alignments (based on travel time, delay at stations etc)
- Commenting on impacts of imlpementing BRT/LRT lanes - lane removal, kerbside and parking impacts, intersection impacts - looking at concept drawings and flagging potential impacts and investigations that would be required
Manilla Port elevated roadway
- Port annual traffic data
- Capacity requirements at intersections + mid-block
-
BCC Feasibility Studies for Preliminary Road Design
- Brookes St - bike lane and network re-routing
- Nudgee Rd
- Dawson Rd
- Lytton Rd
- Hamilton/Webster - signal roundabout
- Old Cleveland Rd - transit lane
- Kelvin Grove Engoggera Rd
-
TIA/RIA
-
New Acland Coal RIA
- Construction phase traffic analysis
- Operational phase traffic analysis
- Traffic warrant assessments
- Sidra assessments for layout requirements
- Vehicle distributions assumptions and spread sheet analysis for future years/networks/ communication
- OLC queue management and safety risks
-
-
-
-
DA Network Engineer Role BCC
- Traffic engineering assessment of road works/upgrades for variety of proposed developments including: schools, shopping centre, residential, medical centres
-
-
Motorway upgrades
-
Ipswich Motorway R2D
- Merge/weaving LOS analysis per HCM methods - length, volumes, allowed movements, trap lanes
-
GC2018 Venue Transport Planner (Secondment)
- PnR site feasibility investigations - Location to venue. capacity, flood resilience
- Work force transport task analysis - determine servies requried for venues based on Games sechedule
- Advising on bus route impacts and new temporary stop locations/features (netBI review, PTIM)
- Quantity takeoffs at venues - Pedestrian fencing, signage
- PnR Transport Facility Operation Plans
- Games Journey Planner application validation testing to all games venues from varying network origins > advising on potential trip issues