Pullman Renovation (HVAC Options with no impact to current Hotel…
Pullman Renovation
HVAC
Options with no impact to current Hotel operation
Heatload
2 typical rooms
(opposite location)
Heating mode???
to comply with Pulman standard and
applicable with existing condition
from Boiler
Heater??
(not recommended by Boydens)
Check and Compare with
existing design values
Typical A/C set-up layout for room
Fresh air requirement
(Pullman standard vs TCVN 5687)
VAV or no VAV (as Marriott 's comments)
AHU with heat recovery option
to ready for upgrading in furture to comply with brand standard
Recommendation to delete from existing layout
BMS or room control unit to be independent but can upgrade in future (CHECK with Cuong to make it being consistent)
ELV
Options with no impact to current Hotel operation
IPTV
cost?
Room Control Unit
cost?
Wifi
LAN
Recommendations for furture improvement
Elec
FA
Options with no impact to current Hotel operation
LOAD --> impact to current DBs
FA detector in ELEK and ELV shafts
LUX level to comply with brand standard
Plumbing & Sanitary
Options with no impact to current Hotel operation
Plumbing
Themal mixxing valve
for more convenience for guest's experience
SAFER
Balancing hot water supply
ready for future upgrading
Pay attendtion to
"5 seconds hot water suppl"
Drainage
pipe material
Sound insulation
Firefighting
Options with no impact to current Hotel operation
Sprinkler head position
in the technical shaft?
Portable hosereel in order to comply with NFPA