Quality Risk Management

Tools

Review Events

Failure Mode Effects Analysis (FMEA)

click to edit

Fault Tree Analysis (FTA)

Hazard Analysis and Critical Control Points (HACCP)

Breakdown large complex processes into manageable steps

Failure Mode, Effects and Criticallilty Analysis (FMECA)

Tree of failure modes combinations with logical operators

Systemic, proactive & preventative method on criticality

Hazard Operability Analysis (HAZOP)

Risk control

Risk Reduction

Risk Acceptance

Mitigation or avoidance of quality risk

Decision to

Accept the residual risk

Passively accept non specified residual risks

It might be appropriate to revisit the risk assessment during the life cycle for new risks or increased significance of existing risks

Example

Hazards that have been assessed and risks that have been accepted

Hazards which have been identified but the risks have not been correctly assessed

Hazards that have not yet been identified

Hazards which are not yet linked to the patient risk

Risk assessment

click to edit

FMEA & links severity, probability & detectability to criticality

Supporting Statistical Tools

Design of experiments (DOE)

Process Capability Analysis

Control Charts

Acceptance control charts

Shewhart control chart

Accumulative sum chart

Risk evaluation

  • compares the identified and analyses risk against given risk criteria —strength of evidence

Risk identification

  • to identify hazards
  • address questions,identify possible consequences
  • provide further step in QRM

Risk analysis -associatedwithidentifiedhazards

  • linking likelihood of occurrence and severity of harms
  • detectability is factor in estimation of risk

click to edit

click to edit