Please enable JavaScript.
Coggle requires JavaScript to display documents.
10: Distribution and warehousing (Systematic handling analysis (SHA) (Step…
10: Distribution and warehousing
Layout planning and materials handling
R= Route
S= Supporting services
Q= Quantity
T= Time
P= Product
Systematic handling analysis (SHA)
Step 5: Gather knowledge and understanding of materials handling methods
Step 4: Visualize the movements (or the flow of goods)
Step 6: Draw up preliminary discussion plans
Step 3: Analyze the movements and the flow of goods
Step 7: Investigate restrictions and modify proposals
Step 2: Determine the layout
Step 8: Calculate the need for equipment, people and money
Step 1: Classify materials and products
Step 9: evaluate
Systematic layout planning (SLP)
Phase 2: Determine the general layout
Phase 3: Detail the layout
Phase1: Determine the location
Phase 4: Equip and install
Specification for a warehouse
The architectural requirements
The technical provisions
The required floor area per activity or department
The activities
The inventory
Internal warehouse functions
Order picking
Dispatch
Put away
Use of equipment
Goods receipt
Order picking methods
Sequential picking per item
Sequential picking per order
Parallel picking per order
Parallel picking per item
Warehouse equipment
Stacker
Electrically powered stacker (pedestrian)
Electrically powered stacker (stand-up)
Manually powered stacker (Pedestrian)
Electrically powered stacker (sit-down)
Warehpuse cranes
Reach truck
Forklift truck
The output perfomance indicator
Inventory management
Warehouse management
The perfomance of the primary warehouse process
The use of resources
The completeness, quality and timeliness of shipments received
Management information from WMS
The stock performance indicator
The resource efficiency indicator
The warehouse performance indicator
The warehouse management indicator
The input performance indicator