Please enable JavaScript.
Coggle requires JavaScript to display documents.
chapter 8 (8.5 material requirements planning (MRP-I) (automation of the…
chapter 8
8.5 material requirements planning (MRP-I)
automation of the card index
material requirements planning
manufacturing resource planning
push system
buckets
dependent demand
independent demand
gross requirements
master production schedule
master production schedule (MPS)
on order
exeption message
planned order release
synchronized batch sizes
lot-for-lot ( LFL)
order suggestions
8.7 just-in-time and kanban
pull system
Just in time (JIT)
TPS, taiichi ohne
the seven wastes
Jidohka
continuous
JIT concept
pull mechanisme
kanban
inbound/ outbound stock
kaizen continuous improvements
masaaki Imai
predictablity
complexity
8.6 manufacturing resource planning (MRP-II)
MRP-II
feedback
sales and operations planning
master production schedule (MPS)
capacity requirements planning (CRP)
imbalance
implementation costs
software
8.9 enterprise resource planning (ERP)
implementation costs
gap between business and ICT
best practises
ERP package
SCM
modeling
performance indicators
8.8 theory of constraints (TOC)
the goal
OPT package
goldratt
bottlenecks
contraints
walking bottlenecks
8.1 production models
parallel production
batch processing
convergent production
modular structure
flow form
8.2 continuous production
continiuous production
assembly line
production line
product flow-oriented structure
8.3 functional layout
batch
batch processing, lot
routing
8.4 manufacturing in groups
manufacturing in groups
autonomous groups
production cells