Risk management features (Evaluate Risk (Avoid, Accept the risk, Reduce,…
Risk management features
Risk identification
Identify and categorize different types of risk
Financial Risk
Delay in schedule
Change in material prices
Miscellaneous expenses
Operational Risk
Rupture of scaffolding
Machinery Breakdown
Material and manual handling
Working at height
Environmental Risks
Natural disasters
Weather implications
Pollution risks
Land contamination
Land use and planning
Political Risk
Changes in regulations
Union issues
Pressure from public
Construction Risk
Miscommunication between client and contractor
Safety of workers
Quality of materials
Technical RIsks
Faulty designs
Unskilled labours
Change in design
Traffic flow
Pedestrians should be informed when heavy materials are lifted via crane
Loading and unloading should be done early morning
Use barricades to alternate traffic
Risk analysis
Likelihood of risk
Likely
Less likely
Unlikely
Impact of risk
High
Medium
Low
Consequences of risks
Catastrophic
Minor
Insignificant
Moderate
Major
Evaluate Risk
Avoid
Accept the risk
Reduce
Share
Mitigate RIsk
Prepare a risk management plan for risks that cant be avoided
Improve capabilities
Identify gaps
Implement a risk response
Legal work safe documentation and approval
Induction for work safety
Control measures
Identify high risk work
Site safety conditions
Fall from height safety
Risks
Working at height
Solution
Safety harness
Safety inspectors
Material transporting on site
Risks
Material falling from height
Solution
Skilled driver operating cranes
Heavy materails difficult to carry
Solution
Use of cranes
Compliance and regulations
Role of work safe
To ensure that hazard identification and safety assessment underpinning the safety case comply with regulations
Role of other parties
Energy Safe Victoria
Environmental Protection Authority (EPA)
Occupational Health and Safety regulations