Please enable JavaScript.
Coggle requires JavaScript to display documents.
RISK IDENTIFICATION (OTHER RISKS (ALLEGRGIES AND SUFFOCATIONS (CHEMICALS,…
RISK IDENTIFICATION
TECHNICAL RISKS
UNKNOWN SITE CONDITIONS
DUE TO NEGLIGENCE DURING INITIAL STUDY
DAMAGE OR THEFT
EQUIPMENT DAMAGE
THEFT OF RESOURCES AND TOOLS
THEFT OF IMPORTANT DOCUMENTS
IMPROPER STUDY OF THE PLAN
WRONG ESTIMATION
WRONG RESOURCE PROCUREMENT
OH&S RISKS
WORK-RELATED INJURY
DUE TO IMPROPER TRAINING
DUE TO NEGLIGENCE
DUE TO NEGLIGENCE OF THE STAFF
CRANES AND HEIGHTS
IMPROPER MAINTENANCE OF THE EQUIPMENT :
HANDLING BY SKILL-LESS OPERATOR
IMPROPER TEMPORARAY STRUCTURES
RAMPS, SCAFFOLDINGS AND STAIRWAYS :
LOOSE NUTS AND BOLTS CAN LEAD TO COLLAPSE OF THE STRUCTURE
IMPROPER HANDLING OF HEAVY MATERIALS
LACK OF EQUIPMENT TO MOVE THE HEAVY MATERIALS
IMPROPER TECHNIQUES DURING HEAVY LIFTING
OTHER RISKS
DAMAGE DURING THE REMOVAL OF EXISTING CLADDING
DUE TO CUTTING USING SHARP TOOLS
HEAVY HITTING
NOISE
CAN DISTURB THE AGED PEOPLE IN THE FACILITY
DUE TO IMPROPER SOUND PROOFING
DAMAGE DURING HAULING OF NEW MATERIAL
CRANE MOVEMENT CAN DAMAGE THE STRUCTURE
CABLES ARE NOT EASY TO HANDLE
ALLEGRGIES AND SUFFOCATIONS
CHEMICALS
OTHER MATERIALS TO FIX THE CLADDING
DUST DURING THE PROCESS
CLIMATIC CHANGES
CAUSES DELAYS
DAMAGES THE MATERIALS