Cam Ranh Resort (500 keys) (Hotel (12 storey - 250 key) (Check the Hotel…
Cam Ranh Resort
(500 keys)
Hotel
(12 storey - 250 key)
Check the Hotel brand standard requirement
Check the design document
from the previous consultant.
Check the Fire Approval document as well
Check the as-built drawing
from the Contractors
HVAC
ELEC
ELV
PL & SA
FIRE PROTECTION
ELEVATOR
Check the Testing forms which were done by Site supervisor
together with the Contactor
ELEC
Panel temperature
Noise at genset
Back-up recovery timing.
Diesel oil supply
Other general safety requirement for electrical system
Earthing system
Lightning protection
ELV
CCTV & Access function testing
PA testing (zoning testing)
BMS function testing.
MDF room layout.
Other ELV system will be tested with their function and utilities.
HVAC
Chiller or Centralized air-con performance (distributing loading and temperature)
Room temperatures (random check)
Air balancing (random check)
Water distribution balancing (random check)
Smoke controlling system (full check with air-flow measuring or velocity verification)
PL&SA
Pressure balancing between zones.
Pressure balancing between hot/cold water
WTP, check the out-put quality of cold water (by third party)
STP, check the out-put drainage water quality (by third party)
Check the main Plumbing plant room arrangement
Check the distribution piping line. To be focus on hot water distribution with: insulation quality, piping support for PPR
Check the drain pipe where can be causing disturbing noise to the guest's experience
Indoor or Outdoor swimming pool with or without heating?
FIRE PROTECTION
Firefighting: the location of sprinkler head, dimension between them to comply with Hotel brand standard and local standard (random check)
Fire Alarm: The Over-ride capability other system in case of emergency.
ELEVATOR
Check the certification and the operation
Check the interlocking condition with FA
Founding items will be clarified by the Contractor and the previous Consultant, if necessary
Further detailing will be determined after checking the design and as-built document
Apartment
(9 storey - 132 key)
Check the Operator's requirement (standard)
Check the design document
from the previous consultant.
Check the Fire Approval document as well
Check the as-built drawing from the Contractors
HVAC
ELEC
ELV
PL & SA
FIRE PROTECTION
ELEVATOR
SIMILAR PROCEEDING WITH THE HOTEL
Founding items will be clarified by the Contractor and the previous Consultant, if necessary
Further detailing will be determined after checking the design and as-built document
Villa
(118 key + Facilities)
Check the Operator's requirement (standard)
Check the design document from the previous consultant. Check the Fire Approval document as well
Check the as-built drawing from the Contractors
HVAC
ELEC
ELV
PL & SA
FIRE PROTECTION
Check the Testing forms which were done by Site supervisor
together with the Contactor
ELEC
Check RCCB functions
Check the size of wiring and cabling with big loading - random check
Check earthing and lightning protection
ELV
Check the CATV for IPTV for villas
Check the TEL and LAN and Wifi working
Check Smart home???
HVAC
Check room temperature - random check but carefully check with the room facing to the West, North- West site or Attic level.
Check the location of outdoor units
Check the toilet exhaust fan: flow & noise may have
PL & SA
The hot water and cold water supply: pressure & temperature
The drainage (local septic tank or centralized STP system with other block??)
Swimming pool system for villas?
FIRE PROTECTION
Fire alarm (heat & smoke)
Portable fire extinguisher
Founding items will be clarified by the Contractor and the previous Consultant, if necessary
Further detailing will be determined after checking the design and as-built document
Infrastructure & Facilities
(Area = ????m2)
Check the design document from the previous consultant. Check the Fire Approval document as well
Check the as-built drawing from the Contractors
ELEC
ELV
PL & SA
FIRE FIGHTING
ELEC
Check the voltage drop via calculation and reality
Check the LUX level for security and code compliance.
Check the earthing for safety condition (high attention to where KIDs can reach to)
Check the capability to upgrading and maintainance in future (manhole and cabling status inside electrical trench
Founding items will be clarified by the Contractor and the previous Consultant, if necessary
Further detailing will be determined after checking the design and as-built document
ELV
Check the infra structure (shall be optic cable back-bone)
Back ground music with zoning on the landscape area
Wifi for the entire of landscape
Check the capability to upgrading and maintenance in future (manhole and cabling status inside ELV trench
STORM DRAIN, DRAINAGE
& WATER SUPPLY
Check the slope & check the depth of manhole (Random check to detailing checking depending on the result of random checking)
Check the existing plant-room for STP.
Check the water supply outdoor grid and capacity to comply with irrigation purpose?
FIRE FIGHTING
Fire hydrant pillar (check the function & gate valve position of maintenance purpose)
Fire extinghuisher