Please enable JavaScript.
Coggle requires JavaScript to display documents.
Certificates ((• D/Pipe install only,, • Rough in of hot and cold…
Certificates
-
-
-
• Rough in and connection of gas to H/P, HWS and capped provision to ducted heater
• Solar HWS install only, panels installed by others
• Recycle water run in, rough in and fit off as per builders plan
-
Ecosmart will not be liable for the identification and the repair of any defects resulting from damage during the building process.
-
-
-
-
-
• Rough in and connection of gas to H/P, HWS and capped provision to ducted heater
• Solar HWS install only, panels installed by others
-
-
Ecosmart will not be liable for the identification and the repair of any defects resulting from damage during the building process.
-
-
- D/Pipe install only,
- Rough in of hot and cold water as per builders plan
- Fit off of all sanitary fixtures as per builders plan
- Rough in and connection of gas to H/P, HWS and capped provision to ducted heater
- Solar HWS install only, panels installed by others
- Recycle water run in, rough in and fit off as per builders plan
- Below ground sewer and stormwater drainage installed and air tested as per builders plan.
- Ecosmart will not be liable for the identification and the repair of any defects resulting from damage during the building process.
- Damages repaired by a third party as contracted by Metricon.
- Appliances will be installed at handover