Steps of Design Build Process
Step 11: Start Construction
Install the company sign and flyer box in front of your residence.
If possible, notify local residents about the building,
Provide the potty dumpster and porta as needed
Assigned project manager to walk with requirements in hand on the planned site, with each trade to do job work
Step 6:Prepare and Submit Final Project Estimate
Based on final drawings, Major Subcontractors offer final bids
Identify end product allowances or preferences
For client, review sketches and expenses
Evaluate and finalize work scope
Step 3: The Preliminary Design Drawing Presentation to Client
Meeting to present and analyze the 3-D proposals at our offices
Allow changes to the arrangements and revisions at that meeting
"Provide Chief Architect "Client-Viewer" software to clients
Step 9: Apply for Permit
The product choice guide must be finished before the construction permit application is submitted.
To ensure that this is complete, clients partner with our Design-Selections Coordinator
Step 5: Prepare Construction Drawings
Builder collaborates with P. E. Engineer to include additional pages of building drawing plan indicating wall parts, framing of roof wall and ceiling, nailing patterns, bracing of shear wall, etc.
Step 7: Financing Procedures (If Applicable)
Loan Request
Approval for Loans
Set appointment for closure of loan and signing of Contractor Contract.
Send Statement of Disclosure to Client for Signature
Step 2: The Design Meeting
Discuss the priorities of projects and special interests
Discuss targets, style and budget for projects
Our Architecture Designer's presentation and qualification
Sign the contract for the design services
"We measure and draw the "As-built" configuration of the home if a remodel is performed,
Step 10: Do the Pre-Construction Conference
Introduce Clients Project Planner
Filled our "Checklist for Preconstruction"
Detailed analysis of the scope of work with the Project Designer, Choices Coordinator, and clients on site
Discuss the initial timetable, operating hours, material collection, debris transfer, selection stage and other things on the checklist.
Step 4: Start Construction Cost Estimating for Revised Plans
Obtain estimates on preliminary concept from large subcontractors
Discuss project preliminary costs and equate the budget
Make appropriate improvements
Having customers negotiate allowances and product preferences with our Coordinator for Design-Selections
Step 8: Contract and Loan Completion
The loan and agreement must be signed at the bank or financial institution
For project lists, the contractor may request vendor and subcontractor lists
Attain mobilization check-10%
Step 1: The Initial Meeting
In-house Interior Designer creation
Build to meet expectations for the industry (NAHB Residential Construction Performance Guidelines)
Design-Build Phase Discussion
Determine living conditions for clients during construction
Discussion on Budget vs. General Expenses vs. Value
Get a copy of the owner's survey on our design software, duplicate site plan
Interview with Client-Contractor