The Goal

To make money

Increase Throughput

Reduce Operating Expenses

Decrease Inventory

Bottlenecks

Short of needed inventory

Too much unneeded inventory

breakdown of equipment

lack of communication

poor metrics at the beginning

Productivity?

Late shipments

Must identify

Need for a common goal

mapped out product flows

WIP buildup

Red/Green priority

Starting point but even Green became Red

Herbie

Move to front to set pace

Lighten load

as strong as weakest link

Compare gap to inventory

Mechanism for dealing with bottleneck

reducing down time

Reducing waiting time for inventory

minimizing batch sizes

Drum Buffer Rope

Pacing

Cost of a bottleneck vs cost of a non-bottleneck

Cost of an hour of the whole system