As far as reasonably practicable (Considering all relevant matters (Cost…
As far as reasonably practicable
Physical condition at site
Safe work site
Accessibility permit requirement
Site induction
Emergency evacuation plan
Control measures for specific time
Construction of tunnel
Terms and conditions of contract agreement should be followed
Safety policies & procedure
using standard safety cases at site such as PPE
Workplace site induction
Security procedure
minimized tolerance level
completion time of tunnel construction
maintaining minimum cost escalation of the project
minimum delay in project
setting standard progress of the work per day
Considering all relevant matters
Likelihood of hazard
weighing all matters
frequency of activity
Degree of harm due to hazard/risk
What the concerned person know about elimination risk
State of knowledge
Potential Equipment failure
System of work/risk control measures
Human inadvertence
Cost of control measures
cost of purchase
Installation
Maintenance
Operation of control measures
availability and suitability of ways to minimize risk
Challenges
Cost efficiency
Cost benefit analysis need to be done
Engineering practice
Meet current engineering code of practice
Site condition
implementation of safety monitoring system
emergency evacuation plan