Please enable JavaScript.
Coggle requires JavaScript to display documents.
Flowchat to get Marina permit/special terminal/terminal khusus (tersus)…
Flowchat to get Marina permit/special terminal/terminal khusus (tersus) based on Law PM 20/2017
Location permit of special terminal
Vishnu Investment Group
Director General of Sea Transportation
Minister of Transportation
Location permit of special terminal
after receiving location permit, we can start to get construction and operation permit
we can start the preparation work for the construction of a special terminal
After receiving the results of the assessment from director general, Minister will issue a location permit
Documents received from the company will be examined, if the documents complete and follow all the procedures, then Directorate General will be sent to the Minister
Administration and technical documents must be provided by the company
Company business permit
The location of the proposed project that is equipped with the geographical coordinates, described in the sea map
A feasibility study that contains the planned volume of loading and unloading of raw materials, supporting equipment and production results. Plan for the frequency of ship visits. Economic aspects that contain the efficiency of the construction of Special Terminal and environmental aspects
The results of the hydro oceanography, topography and benchmark surveys of port location are expressed in geographical coordinates
Recommendation from Shahbandar, after obtaining consideration and survey results from the head of the navigation office
Recommendation from Governor of Bali regarding the suitability of the spatial layout of the province with a special terminal location
Recommendation from Mayor of Denpasar regarding the suitability of the spatial layout of the region with a special terminal location
Company financial statements for at least the last 1 year, audited by a registered public accounting firm
Have a minimum capital of 1 billion rupiah
Construction and Operation Permit of special terminal
Vishnu Investment Group
Administration documents must be provided by the company
Deed of company establishment
izin usaha/ business permit of the company
A copy of the location permit of special terminal
Tax ID number/NPWP
Proof of land ownership or renting the land or any agreements that show the company has rights on the land.
Company financial statements for at least the last 1 year, audited by a registered public accounting firm
Technical documents must be provided by the company
Dock layout
Calculation and pictures of building construction
Results of soil conditions survey
The results of shipping safety studies include shipping lines and port pond
The boundaries of the plan for land and water areas described with geographic coordinates. As well as special terminal master plans
Environmental studies that have been approved by the environment department
Service systems and procedures in special terminal
Availability of human resources in the technical field of port operations that have competencies proven by certificates
A feasibility study that contains the planned volume of loading and unloading of raw materials, supporting equipment and production results. Plan for the frequency of ship visits. Economic aspects that contain the efficiency of the construction of Special Terminal and environmental aspects and aspects of shipping security and safety
Recommendation from Shahbandar, after obtaining consideration and survey results from the head of the navigation office
Director General of Sea Transportation
Documents received from the company will be examined, if the documents complete and follow all the procedures, then Directorate General will issue a construction and operation permit
Construction and Operation Permit
This permit is valid for 10 years and can be extended
the construction of special terminal starts
Operation of special terminal
After the construction is complete, the owner of the special terminal must obtain recommendations from the Port Authority
Information that the construction of a special terminal has been completed in accordance with the permit given by the director general and is ready to be operated
The results of the construction of a special terminal have met the aspects of shipping security and safety
Considerations from the Navigation Office about the readiness of the shipping lane and shipping navigation aids fasilities