Please enable JavaScript.
Coggle requires JavaScript to display documents.
Project Overall Tasks (Week 1 (Week 2 (Week 3 (Week 4 (Model evaluation,…
Project Overall Tasks
Week 1
-
TOPMODEL
(1) Understand concept - Fully understand.
(2) Get code and take a look;
(3) Understand FULL topmodel structure: how is
routing (overlandflow, shallow subsurface, flow, etc)
(4) try running TOPMODLE with collected CZO data (precip/ET)
Study WRF-Hydro
(1) Noah-MP output style understand-grid (use P vs ET)
or soil moisture, infiltration excess surface runoff, Q-drain, rsb
(2) Modifying NetCDF output to calculate watershed area weighted mean.
(3) Getting NWM dataset for study area (after 3-c)
(4) Able to run original NWM
Study about CZO sites
(1) List the data availability
(2) Check DEM availability and select the resolution for studies(very important)
(3) Select a time period to run - by looking into hydrograph and meteological observation data
-
-
-
-
About data
Data collection:
CZO selection: (1) Arizona;
(2) Eel creek.
Be aware of : (1) availability of groudwater data;
(2) soil moisture data;
(3) area size.