Please enable JavaScript.
Coggle requires JavaScript to display documents.
Emerging Energy Eng.#10 PAAE343019 cranskshaft replacement (Special tools…
Emerging Energy Eng.#10 PAAE343019 cranskshaft replacement
FS
Mechanical
Engine disassembly (cylinder heads, pistons, sump)
New cranskshaft tightening
Broken crankshaft loosening
Engine reassembly
Sump sealing
Cilynder heads reassembly (calibrated torque and register)
Counterweight assembly
CS + flywheel reaming
Fitted bolts
Reamers kit
Flushing
Crankshaft preservation plan (Tectyl)
Electrical
Civil works
Platforms removal
Fans removal
Walls removal
Heavy lifting
Special tools
Hydraulic jacks
Cantilever support
Beams
Tackles
Slings
Boom crane for crankshaft (old and new one) lifting
Miscellaneous
Special tools (to be provided by Wartsila)
Jacking bolts M30x3.5
Hydraulic jack for main bearings
Trolley for crankshaft movement (2 pcs.)
High load wheels
Beams (under baseframe in place of springs)
8 pcs. support for crankshaft (arc shaped)
Studs M45x4.5x475 mm