Please enable JavaScript.
Coggle requires JavaScript to display documents.
9th class (Methodology of my project) (Step 4 (Storage (a) Choosing a…
9th class
(Methodology of my project)
Step 4
Storage
a) Choosing a convenient location for storage
protected from sulight and water
Labeling,color coding
Area in center of district
b) Separation
to keep a check
o unwanted waste material added to the bins except the three recyclable materials we want.
Each material needs to be further separated according to their grade and type.
filter out any hazardous waste or contaminants
c) Selecting suitable storage methods and containers
Step 1
Information gathering
a) Different types of materials that can be recycled
Metal
Plastic
Paper
b) Current collection system
intial collection
handcarts
donkey pull-carts
secondary collection
open trucks
tractor/trolley systems
handled by the local and municipal government
c) Different collection methods
of source separation recycling
Mixed collection of recyclables
Separate collection of recyclables
Step 2
Obtaining license
Pakistan Environmental Protection Act (PEPA)
a framework for establishing federal and provincial Environmental Protection Agencies
Step 3
Collection
a) Selecting collection methods
Mixed collection of recyclables
b) Factors to be considered in
determining collection equipment
cost
capacity
the expected volume of each recyclable material
expected rate of participation in different areas
c) Determining collection equipment
Recycling bins
For households
For commercial units
Garbage collection dumper trucks
d) Choosing the appropriate number &
location of equipment
For public access
For individual households and businesses
Step 6
Human resources
a) Engineers
They will be responsible for the purchase, maintenance and repair of the machinery.
As the program is initially starting with maximum 6 trucks and 2 balers, at least 3 engineers to handle them.
Engineers are needed to handle the recycling machinery like garbage picking trucks and balers.
b) Onsite guards
protect our storage site
2 security guards
each with changing shifts
c) Marketers
responsible for raising awareness among people about recycling in general, our project and its purpose and importance.
we need to have a team of at least 10 marketers in the start.
d)) People for on-site for
sorting and separating
a team of 6 people is needed
separating and processing the 3 recyclable materials
knows how to differentiate between the different kinds
f) Garbage collectors
will actually carry out the actual recycling process
a team of at least 12 collectors
two people to handle each truck during the collection process.
Step 7
Marketing plan
a) Collaboration with
popular organizations
Port Grand: food street plus entertainment spot
Clifton Beach: most famous beach of Pakistan
Dolmen mall: a shopping complex
b) Door to door awareness campaigns
residents
industries and other commercial units
c) Sessions in schools
and universities
interesting and educational sessions and workshops
Interactive and fun activities
d) Social media
Trending hashtags
Attractive posters
Pictures of the project being carried out to show its success
Stories about how people benefited from this program
e) Spot marketing
7 major areas
remind them about recycling
3 banners and 10 posters in each area
Step 5
Compacting and delivery