Throughput Accounting (TPA)

Theory of Constraints (TOC)

key financial concept is to maximize of throughput while keeping conversion & investment costs to a minimum

Throughput = Sales revenue - Direct Material Cost

TOC focus on bottlenecks in the production process which act as a barrier to throughput maximization

Goldratt's 5 Steps

Step 1 : Identify the binding constraint (bottleneck)

Step 2 : Exploit, highest output must be achieved from bottleneck

Step 3 :Subordinate, operate at same speed so WIP does not build up

Step 4 : Elevate,by improving the efficiency

Step 5 : return to step 1

TPA

based on binding constraints

use JIT environment because of the emphasis on throughput, inventory minimization and cost control

all factory costs are fixed except for material cost

accepting idle time in non bottleneck operations by producing JIT

profit is determined by the rate at which throughput can generate

Calculating / Formula

total factory costs = fixed production costs including labour

return per factory hour = (sales - material)/ time on resources (LF)

cost per factory hours = total factory costs/ total time on resources (total LF)

TPAR = return per factory hour / cost per factory hour

TPA and decision making

Ranking

single : products/division are ranked by TPAR

more products made in same factory, ranked on return per factory hour

target for decision making

TPAR should be greater than one

return per hour enables business to make short-term decisions when there is a scarce resources

priority to products with best ratios

use in performance management

a division is not discouraged from build up inventory

production costs should only be incurred if there is an immediate return generated

How to improve TPA ratio (increase the ratio)

increase the TP per bottleneck hour

reduce the operating cost per bottleneck hour

increase the selling price

reduce material cost per unit

reduce expenditure on operating costs

improve efficiency of the bottleneck hour

elevate the bottleneck so that more hours available for the bottleneck resources