risks
Contingencies and risks
Participants
Subcontractor
Delay
Supplier
Material quality
Delay
Labor
Availability of skilled labor resources
Strike
Safety
Poor site safety
Safety accidents
Material
Delay in procurement
Remanufacturing due to quality control or damage during production or delivery
Logistics
Change of delivery schedule
Later
Earlier
Drivers' strike
Custom check
Reapplication of custom declaration
Transportation road surface damage
Transportation vehicle damage
Mistaken delivery
Loss due to damaged material
Site access
Loss or delay due to resource availability
Equipment
Equipment breakdown and maintenance
Shortage of essential equipment
Construction
Delay of work inspection
Installation error
Losses and delays due to improper means and methods of construction
Quality problems
Change of construction methods?
Natural risks
Inclement weather (Black rain and strong wind)
Weather-sensitive activity
Accidents
Fire
Design
Design change
Weak response to design change
Bad/faulty design
突發情況及風險
物流
資源可用性導致的丟失或延遲
地盤可達情況
材料損壞造成的損失
錯誤的交貨
運輸車輛損壞
運輸路面損壞
重新申請海關申報
海關檢查
司機罷工
交貨時間變更
提早
延遲
施工
改變施工方法
質量問題
由於施工方法不當造成的損失和延誤
安裝錯誤
工作檢查延誤
設計
設計缺陷
對設計變更的反應不及時
設計變更
合作夥伴
供應商
發貨延誤
材料質量不達標
分包商
工作延誤
糾紛
自然風險
意外
火災
其他
惡劣天氣
黑雨
風球
設備
基本設備短缺
設備故障和維護
材料
由於生產或交付過程中的質量控製或損壞而進行的再製造
採購延遲
安全問題
安全事故
地盤安全性差
人工
工人罷工
找不到熟練的工人